An upcoming metro corridor connecting Wadala to Kasarvadavali.
A proposed circular metro network strengthening intra-Thane connectivity.
A 12.2 km underground road improving connectivity to the western suburbs.
Upcoming 26 km elevated corridor connecting to Navi Mumbai International Airport.
A planned metro line connecting Thane to Kalyan via Bhiwandi.
A 11.84 km underground corridor, set to connect Thane to Borivali.
Part of the Mumbai-Ahmedabad corridor, and positioning Thane as a multimodal hub.
An upcoming flyover aimed at improving commute flow in central Thane.
of building trust.
developed across Mumbai.
have found their dream homes.
of building trust.
developed across Mumbai.
have found their dream homes.
This project is registered under MahaRERA Registration No. PR1331012600086 and is available on the website maharerait.mahaonline.gov.in This document does not constitute any offer and/or contract of any nature whatsoever. All transactions shall be subject to the terms and conditions of the agree – ment of sale between the promoter and the recipient. All images, information, drawing, and sketches shown in advertisements and promotional materials are for representational purpose only. This project is registered as Vakratunda Anantaraa Tower 1 under MahaRERA. Project is Mortgaged with and Funded by Bajaj Hous-ing Finance Limited. No objection certificate/ permission to mortgage from Bajaj Housing Finance Limited will be provided for sale of flats | T&C apply.